Engaged by Ventia to support the staged decommissioning and replacement of the 6.6 kV MCC 861 at BHP Finucane Island. Works were executed within a live operational plant, requiring controlled isolation, temporary generation supply and structured cutover sequencing to maintain continuity of critical equipment — delivered in line with BHP and Ventia shutdown and safety frameworks.