Engaged by Ventia to support the staged decommissioning and replacement of the 6.6 kV MCC 861 at BHP Finucane Island. Works were executed within a live operational plant, requiring controlled isolation, temporary generation supply and structured cutover sequencing to maintain continuity of critical equipment — delivered in line with BHP and Ventia shutdown and safety frameworks.

SCOPE OF WORKS

What we delivered

OUTCOME

Replacement completed within the shutdown window and in line with BHP and Ventia safety frameworks. Continuity of critical equipment was maintained throughout, with zero safety incidents.